Free tool · No sign-up · Nothing uploaded

Energy Upgrade Quote Checker — Is This Quote in the Right Order?

A contractor has quoted you new windows, a new heating system, insulation or a water heater. Before you sign, test that one quote against 8 good signs and 4 red flags. The checker scores what is actually in writing — and any red flag pauses the verdict, however tidy the quote looks. Everything runs in your browser: nothing you type is uploaded.

1. The quote in front of you

Optional labels — used only to title your printed summary. Leave them blank and the check still works. Do not type account numbers or payment details; this tool never needs them.

2. The 8 good signs — tick only what is in writing

A promise made out loud is not a good sign. Tick a box only when the quote or contract itself says it, in words you can point to later.

0 of 8 good signs in writing

  • The contractor asked about or looked at drafts and weatherstripping, the system filter and service history, and the attic hatch — or those basics are included in the quote itself. Expensive first, basics never, is the wrong order.
  • Equipment or materials, labour, permits and disposal appear as separate lines, so you can see what each part costs and compare a second quote line by line.
  • SEER2 or HSPF2 for heating and cooling, U-factor for windows, R-value for insulation. A rating you cannot read on the page cannot be checked, substituted or enforced later.
  • If a savings number was used to sell the job, it appears on paper with the assumptions behind it. No written basis means the number was a sales line, not a commitment.
  • Extra work found mid-job — rot, wiring, a damaged flue — needs your written approval before it starts and before it is billed. Silence on this point is where quotes grow.
  • A small deposit, staged payments as work is completed, and the balance on completion or inspection. Most of the money before most of the work removes your only leverage.
  • Manufacturer warranty, labour warranty and workmanship warranty are each named with a length of time. “Fully guaranteed” with no duration and no named party guarantees nothing.
  • Same scope, same written ratings, from a different company. One quote can tell you what a job includes; only a second quote can tell you whether the price is in a normal range.

3. The 4 red flags — tick any that happened

These are not paperwork gaps; they are pressure and process failures. One ticked flag pauses the verdict until the flag itself is resolved — a reissued quote, a written number, a real visit.

  • A discount that dies tonight is a closing technique, not a cost saving. A fair quote survives the time it takes to read it and compare it.
  • If the number cannot be written down with its basis, it was never a guarantee. Ask for it on paper; the answer to that request is the information.
  • A price set without looking cannot know about the leaks, the access, the wiring or the condition that decide what the job really is — and what should come first.
  • Age alone is not a verdict. A real failure has evidence you can be shown; a replacement sold without evidence is a sale first and a diagnosis second.

4. Your verdict and fix-first list

The verdict follows two rules: red flags first, score second. The list below is ordered the way to work it — resolve flags, then close the missing good signs, in that order, before any signature.

Verdict
Start ticking above
Tick the good signs that are genuinely in writing, and any red flags that genuinely happened. Your verdict and fix-first list will appear here.

    Privacy: this tool runs 100% in your browser. The amounts, names and notes you enter are never sent to, or stored on, our servers — reload the page and they are gone. Printing uses your own browser’s print / save-as-PDF. The example button fills clearly labelled fictional data so you can see how a verdict looks — it is not a real quote or a customer case.

    How to use this checker

    Work from the paper, not the conversation. Open the quote itself and tick a good sign only when you can point to the line that says it. Most quotes lose points the same way: the rating is missing, the savings number was only spoken, and the payment schedule asks for most of the money before most of the work. Those are fixable — ask for the missing lines in writing and re-check the reissued quote.

    The red flags work differently. They are not missing lines; they are signs the order itself is wrong. A quote priced without seeing the home cannot know whether the upgrade belongs first. A savings figure guaranteed out loud and refused on paper tells you the number was never real. Either flag means: pause, resolve that one thing, and only then judge the paperwork.

    What this checker cannot do: it cannot tell you whether the price is fair — no checklist can, without a second quote for the same scope in the same area. It cannot see your home, read your bills, or decide whether this upgrade should happen before sealing, insulation and service basics. That whole-house order is what the tools and the audit below are for.

    Not sure the upgrade belongs first at all?

    Start free with the Home Energy Loss Self-Check: enter 3 months of bills, work through 15 checks in the 5 loss areas, and see which area ranks first for your home. Or take the full step: the Home Energy Audit reads your actual bills and photos together and returns one plain-English report — where the money is going, the fix order that makes sense, and what not to buy yet. Before you send anything, cover or black out utility account numbers and personal details — the audit needs usage and cost, not account numbers.

    One-time payment · No recurring charges · 30-day refund policy. The report is general information based on the bills and photos you send; it does not replace an in-person inspection or a licensed energy audit, and it does not guarantee savings.

    Frequently asked questions

    Is this quote checker really free?

    Yes. No account, no email form, no limit — and it runs entirely in your browser, so nothing you type ever leaves your device.

    What quotes can I check with it?

    Any home energy upgrade quote — windows, heating and cooling, insulation, air sealing, a water heater. The signs and flags test the order and the paperwork, not the brand of equipment.

    Why does one red flag cap the verdict?

    Because pressure and missing paperwork are how the wrong order gets signed. A tidy quote can still be the wrong job at the wrong time. Fix the flag first, then re-check.

    Does a high score mean the price is fair?

    No. The score means the quote is complete and written down. Fairness needs a second quote for the same job — which is itself one of the 8 good signs.

    Why do the basics come before equipment and windows?

    New equipment heating a leaky home runs longer and costs more to run, whatever its rating. Public ENERGY STAR and Department of Energy guidance puts sealing, insulation and service basics first for the same reason.

    Does this replace a full Home Energy Audit?

    No. This tool checks one quote you already have. The full audit is prepared from your actual bills and photos and gives a fix order for the whole house — including whether this upgrade belongs first at all.

    Is this legal advice about my contract?

    No. It is general information to help you ask better questions before signing. Contract and cancellation rules vary by state and city; for a large or disputed contract, a local consumer-protection office or attorney is the right next step.

    AddressRiskReport is an independent service. It is not affiliated with or endorsed by ENERGY STAR, the U.S. Environmental Protection Agency, or the U.S. Department of Energy. This tool is general information for your own decision-making and does not replace an in-person inspection, a licensed energy audit, or legal advice about a contract. Questions: contact@addressriskreport.com · Portland, OR.